About this Project

In the glue section of this local flooring manufacturer, the area had become heavily contaminated with process materials, gullies had been blocked and safety markings could not be seen. Over the course of a 3-day weekend, contaminants were removed, gullies unblocked and treated, floors repaired with fast setting materials, then refinished in our fast curing MMA resin. Everything was back open for full forklift use at 10pm on Bank holiday Monday night. These coatings fully cure in 2-3 hours.